20067 – Structural Review – Dome Cladding Review – Descent of the Holy Ghost June 3, 2020
This quote does not include:
-
Allowances for any changes to the scope of work.
-
Should the structure require design changes, which would necessitate a separate permit, a separate proposal will be issued for that scope of work.
If the engineering cost above is agreeable, please sign and return the attached confirmation of assignment.
Vertical Engineering Ltd. trusts this proposal is sufficient for your purposes. If you have any questions or concerns, please do not hesitate to contact us.
Sincerely Vertical Engineering Ltd.
_________________________
Kyle Howe, P.Eng.