We are pleased to submit a proposal as outlined herein
EDCO ARROWLINE LIFETIME METAL ROOFING SYSTEM - MAIN HOUSE & GARAGE
Total protection of homeowners' and neighbours ' property.
Complete tear-off existing roof to sound deck and disposal of all related roofing rubbish. NOTE: Complete tear off is recommended best practice for metal roof installations.
Delivery of all materials supplied by Dayus Roofing.
Thorough deck inspection. Deteriorated plywood decking will be replaced for $2.50 / sq ft (3/8") Install Certainteed Metalayment leak barrier to eave edges, valley areas and all roof penetrations.
Install Certainteed Metalayment leak barrier to arched dormers at front of home and at flat roof transition
Install Certainteed Diamond Deck Underlayment to remaining roof deck for complete underlayment coverage.
Install EDCO Arrowline Eave Starter to eave and gable edges as per manufacturers instructions Install EDCO Arrowline Sidewall flashings as per manufacturers instructions
Install EDCO Arrowline open metal valley detail to valley areas of home
Install EDCO Arrowline Shake Metal roofing panels as per manufacturers instructions
Install EDCO Arrowline Hip/Ridge with vented trim line along ridges of home
Install EDCO Arrowline Hip & Ridge cap detail as per manufacturers instructions
Install 2 new Ultimate pipe flashings
Install new custom bent metal to round dormers on main house (3)
Install Sno Gems 1/2 Carat kynar coated snow protection to front of garage and upper main house slopes
Re-move existing metal and roofng materials as required to prepare for install
Install Certainteed Metalayment leak barrier to deck of dormer roofs
Install custom bent 16 oz. roofing copper to entrance roof
SubTotal $40,774.89