East Windsor – Surface Flooding Risk Reduction
Regional Area 1 & 2 – Ford Pump Station
Proposed Improvements to the Ford Blvd. Pump Station are part of the comprehensive preferred solution alternative for Regional Area 1 and 2 .
Assumptions:
-
• The capacity of the proposed pump station is based on providing a 1:100 year storm level of service
-
• This includes added reliance for major roadways to mitigate surface flooding during a Climate Change Storm (1:100 year + 40% Factor)
-
Ford Pump Station Improvements include:
-
• Replacement of existing pumps with higher capacity pumps within the existing underground structure.
-
• Addition of control to better monitor and control the operation of the pump station.
-
• Consider the addition of an emergency back up power generator.
Schedule A Project
This pump station has been identified as an immediate priority and is included in the Application for Disaster Mitigation and Adaptation Funding – Intake 3 (Funding Pending)