Central Windsor – Basement and Surface Flooding Risk Reduction
Drouillard Road Storm Sewer and Pump Station
Solution Objective:
Reduce surface flooding risk for major roadways.
-
Under Climate Change Storm (1:100 year + 40% Factor) reduce surface flooding to less than 30 cm(1 ft.) along the Drouillard Rd. and Wyandotte St. E underpass.
Key Solution Components | |
Source COntrol |
|
Improve Sewer Syetm |
|
Improve Outlet |
|