Sewer Connections – obtain a permit from the Engineering Department to connect the private sanitary connection to the future service provided at the property line.
Land Conveyance for road widening purposes – gratuitous conveyance of
-
3.0m wide parcel across the entire 7th Concession Road frontage, and
-
2.0m wide parcel across the entire Baseline Road frontage of the subject lands,
to the Corporation, in fee simple and without encumbrance, in accordance with the requirements of the County Road 42 portion of the Lauzon Parkway Environmental Assessment Report, and to the satisfaction of the City Engineer;
Corner Cut-Off – gratuitous conveyance of a corner cut-off sufficient in magnitude to facilitate improvements at the 7th Concession Road/County Road 42 Intersection, in accordance with the requirements of the County Road 42 Portion of the Lauzon Parkway Environmental Assessment Report, and to the satisfaction of the City Engineer;
Sidewalks – at the discretion of the City Engineer,
-
Construct at their expense and according to City of Windsor Standard Specifications, a concrete sidewalk along the entire 7th Concession Rd and Baseline Road frontages of the subject lands. All work to be to the satisfaction of the City Engineer; or
-
Pay to the Corporation the sum of $25,000.00 being the Owner’s contribution towards the future construction of a concrete sidewalk along the entire 7th Concession Rd and Baseline Road frontages of the subject lands;
Curbs and Gutters – at the discretion of the City Engineer,
-
Construct at their own expense and according to City of Windsor Standard Specifications, a concrete curb and gutter along the entire 7th Concession Rd and Baseline Road frontages of the subject lands. All work to be to the satisfaction of the Corporation’s City Engineer; or
-
Pay to the Corporation, prior to the issuance of a construction permit, the sum of $14,000.00 being the Owner’s contribution towards the future construction of concrete curb and gutter on the frontage of the subject lands;
Storm Detention - construct storm detention scheme, to the satisfaction of the City Engineer and the Ministry of Environment, Conservation & Parks (MECP).
ERCA Requirements – follow all drainage and flood-proofing recommendations of the Essex Region Conservation Authority (ERCA) may have with respect to the subject land, and obtain all necessary permits from ERCA with respect to the drainage works on the subject lands