-
2. Where a 4-ft. wide residential sidewalk is constructed, the City will absorb:
-
The cost of the walk at intersections.
-
Seventy-five (75%) percent of the cost of the first 150 feet of lot flankage.
-
Twenty-five (25%) percent of the remainder of the total cost of the work.
-
-
3. Where a residential sidewalk is constructed wider than 4 ft. for pedestrian safety, the abutting property owners will be assessed for only a 4-ft. wide walk. The City will absorb the balance of the cost in addition to the amounts set out in 2(a) and 2(b) above.
-
4. Where a sidewalk:
-
Is required to serve more than the abutting properties or is required on a school approach street;
-
Is required for the safety of children in the community travelling to and from school;
-
Is requested or endorsed by a School Board; and
-
Where it would be unequitable to charge the full cost of the walk to the abutting property owners;
The sidewalk will be termed a „school approach sidewalk‟ and the total cost therefore will be paid by the City.
-
And further, that Council Resolution 94/68 adopted on January 22, 1968, and that Council Resolution 305/73 adopted on April 9, 1973 setting forth a policy in respect of such Local Improvements BE RESCINDED.