Appendix C - Comments
Agency/Department | Comment |
---|---|
Building Department | The Building Code Act, Section 8.(1) requires that a building permit be issued by the chief building official for any construction or demolition of a building. It is strongly recommended that the owner and/or applicant contact the Building Division to determine building permit needs for the proposed project. The City of Windsor Building Division can be reached by phone at 519-255-6267 or through email at |
Heritage Planner | This property and it is located on an area of low archaeological potential. Nevertheless, the Applicant should be notified of the following archaeological precaution:
Contacts: Windsor Planning & Building Department: 519-255-6543 x6179, Windsor Manager of Cultural Affairs: Cathy Masterson, 519-253-2300x2724, Ontario Ministry of Heritage, Sport, Tourism and Culture Industries Archaeology Programs Unit, 1-416-212-8886, Windsor Police: 911 Ontario Ministry of Government & Consumer Services Registrar of Burial Sites, War Graves, Abandoned Cemeteries and Cemetery Closures, 1-416-212-7499, |
Enbridge Gas | After reviewing the provided drawing at 1521 Pierre and consulting our mapping system, please note that Enbridge Gas has active infrastructure in the proposed area. Enbridge Gas requires a minimum separation of 0.3m from all of our plant. Please ensure that this minimum separation requirement is maintained, and that the contractor obtains locates prior to performing any work and utilizes safe excavation practices while performing any work in the vicinity. Also, please note the following should you find any abandoned infrastructure in the area: · Any pipe that is excavated, please assume that it is live. |