INFRASTRUCTURE CONSTRUCTORS

Marentette Mangin Drain Stormwater Management Report

Revision History

Revision

Date

Status

Prepared By

Checked By

Reviewed By

A

31 Jan 12

Draft for HMQ Review

KTL

PED

BGH

B

04 Jun 13

Final Draft for HMQ Review

HSI

PED

BGH

Name, Title

Signature

Date

Prepared By

Hanna Ibrahim

04/06/13

Reviewed By

Paul Donahue, P. Eng.

KM DWI»

04/06/13

Approved By

Brian Huston, P. Eng.

04/06/13

This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of HMM being obtained. HMM accepts no responsibility or liability for the consequence of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify HMM for all loss or damage resulting therefrom. HMM accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.

Project:

Windsor-Essex Parkway

Document:

Marentette Mangin Drain Stormwater Management Report

Doc No.: