INFRASTRUCTURE CONSTRUCTORS
Marentette Mangin Drain Stormwater Management Report
Revision History | |||||
Revision | Date | Status | Prepared By | Checked By | Reviewed By |
A | 31 Jan 12 | Draft for HMQ Review | KTL | PED | BGH |
B | 04 Jun 13 | Final Draft for HMQ Review | HSI | PED | BGH |
Name, Title | Signature | Date | |
Prepared By | Hanna Ibrahim | 04/06/13 | |
Reviewed By | Paul Donahue, P. Eng. | KM DWI» | 04/06/13 |
Approved By | Brian Huston, P. Eng. | 04/06/13 |
This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of HMM being obtained. HMM accepts no responsibility or liability for the consequence of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify HMM for all loss or damage resulting therefrom. HMM accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.
Project: | Windsor-Essex Parkway |
Document: | Marentette Mangin Drain Stormwater Management Report |
Doc No.: |