Labor charges for replacement or repair plus 20%.
Cost of shipping and handling plus 20%.
8.2 The actual costs plus 20% of air freight bills incurred for equipment from the job site, except as provided otherwise by Client.
shipments
to and
8.3.
PER DIEM ON ALL JOBS MORE THAN 50 MILES FROM MPC BASE
A. Per Diem allowance varies based on the federal per diem rates as published the US. General Services Administration (hllQ://www.gsa.gov).
by
B. Lodging will be reimbursed at the actual cost incurred plus 20%.
8.4. Airfare to and from
thejob site
will be reimbursed at the actual cost plus 20%.
8.5. Subcontractors, if required for performance ofwork, will be charged
at actual cost plus 20%.
8.6. Materials and 20%.
supplies required for the performance ofwork will be billed at actual cost plus
9. PREVAILING WAGES. Prevailing Wage rates are not included in any of MPC’s rate schedules. If any work is subject to Prevailing Wage rates, Client shall provide a copy of the speci•c wage determination(s) and MPC will develop a Client-Speci•c schedule to
accommodate those prevailing wage rates.