THE
REVIEW PROCESS
Why Here?
Request from the
Why MDOT?
Appilicoable federal and sioie iows/reguleiions include: ..449 US5CC@§51ii12
in Michigan reSsponsible for Non"-
iesirldions
Rodioociive Hazardous Moieiiuls
:J
Public Outreach Comments.
be :emovedE
submitted
submitted
submitted
(NRHM) routing designoiions,
0'
,
resiriciions end requiremenis.
J
J
39 | |||||
iesirldions | Should new restriciions | 0: | |||
0' | Public outreach siep in the | reqU'rememS be added ' | 2 | ||
review process |
KEY POINTS
designoiing Michigan roadways where NRH/Vi should be resiricied
or cannot roads and
hiromvvecli, no!t where it can go,. NRHM can be transported on bridges.
non-resiricied
The synopsis report is preliminary No final decision has yei been made. Siudies and technical analysis were the basis of ihe synopsis iepori issued in December QOT 2. This is ihe iime for MDOT i0 receive and consider public comments and oiher informoiion before making 0 final determination. The safety oi ciiizens end the traveling public is 0 primary concern.
is responnssii’hiie for placing
restrictions on Police Ooric‘di/C(rir‘ local