1.0 Description of Work
The work to be completed under this Contract consists of the furnishing of all labour, equipment, supervision and materials necessary to carry out the following:
-
Clearing of blowdown (trees that have been blown down by the wind) from within the drain bottom and drain banks from Station 0+648 to 1+002, in accordance with the drawings and specifications. Work should entail the following:
-
Complete removal of all trees that have blown over within the limits of the channel; and,
-
Removal of brush along the channel banks within the lower half of the channel.
-
-
Improvements to the outlet structure at Station 0+000 entailing the following:
-
Break out and remove concrete-parged, masonry bulkhead from within the outlet chamber;
-
Remove and dispose of gabion rock from within outlet chamber; and,
-
Repair damaged bar grate.
-
-
Install a custom fabricated steel bar inlet cage be installed over the end of inlet sewer as depicted in the attached design drawings.
In addition to the project specific specifications, reference is made to applicable OPSS Forms and City of Windsor Standard Specifications. OPSS Forms can be accessed at:
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/OPSHomepage
Applicable sections of the City of Windsor Standard Specifications can be accessed at:
https://www.citywindsor.ca/business/buildersanddevelopers/Pages/Standard-Specifications.aspx
Both standards shall govern the drainage improvement works.
2.0 List of Drawings
The following drawings are part of this Contract.