Table 8.5 - Summary of Existing and Proposed Peak Flow Rates at Lambton Street Storm Sewer Inlet

Return Period Event Existing Peak Flow (m3/s) Proposed Peak Flow (m3/s)
2-Year 0.86 0.73
5-Year 1.13 1.12
10-Year 1.36 1.36
25-Year 1.62 1.59
50-Year 1.82 1.77
100-Year 2.09 1.98

9.4    SWM Pond 5 Design Summary

SWM Pond 5 operating characteristics are summarized in Table 9.4. Only the 24-hour duration results have been summarized, since the 24-hour duration produced the most conservative storage requirements.

Table 9.4 – Summary of SWM Pond 5 Operating Characteristics

Return Period (years) Inflow (m3/s) Outflow (m3/s) Maximum Storage (m3) WSEL (m)
Extended Detention 0.94 0.06 2086 179.45
2-Year 1.47 0.11 4117 179.82
5-Year 1.91 0.29 5107 179.99
10-Year 2.23 0.37 5867 180.12
25-Year 2.60 0.40 6902 180.28
50-Year 2.89 0.43 7779 180.42
100-Year 3.18 0.45 8677 180.55

The detailed design of SWM Pond 5 is in accordance with the MOE Stormwater Management Planning and Design Manual (2003). Design features include:

Supporting calculations for the sizing of Pond 5 are provided in Appendix E of this report. The 90% detailed design drawings for SWM Pond 5 are also provided in Appendix E; and include plan, section,