Where a sidewalk meets the conditions of the Pedestrian Generator Policy, the total cost of the sidewalk and boulevard restoration will be paid by the City.
Where a sidewalk is constructed on a transit route, the total cost of the sidewalk and boulevard restoration will be paid by the City.
4.5 STREET LIGHTING
Where:
-
A municipal right-of-way is currently without street lighting; and,
-
Abutting property owners have requested in writing street lighting be installed; or
-
The City initiates the installation of street lights as a local improvement
The abutting property owners will be assessed for:
-
50% of the cost for standard street lighting;
-
50% of the cost for boulevard restoration.
In addition, where flankage properties exist, those property owners will be assessed for:
-
25% of the cost for street lighting and boulevard restoration along the first 45 metres of lot flankage;
-
100% of the cost of any remaining works over and above the first 45 metres of lot flankage.
The City will pay:
- The remainder of the total cost of the work, as outlined in section 4.6.
If ornamental street lighting is requested by the property owners, then the owners will be responsible for 100% of the cost difference between standard street lighting and ornamental street lighting.
4.6 CITY'S SHARE FOR LOCAL IMPROVEMENT WORK
For all local improvement work implemented under this policy, the City's share of the cost will consist of the following:
-
The cost for the work at intersections;
-
The cost for the work in front of city owned property and alleys;
-
The cost related to road drainage;
-
The cost of additional road width greater than 8.6 metres;