Implementation: The City has already begun!
Existing Programs and Construction Projects Already Underway
-
Inflow and Infiltration Reduction Program: Completing the extensive condition assessment on sewer infrastructure to guide maintenance and upgrade decisions (70% of City’s sewers have been assessed).
-
Basement Flooding Subsidy Program: (Uptake: 10% City residents).
-
Downspout Disconnection Program (Uptake: 8% City residents).
-
Disaster Mitigation and Adaption Fund:
-
Matthew Brady Storm Sewer and LIDs – Phase 1.
- Tranby Park Stormwater Management Improvements (2020)
-
Upcoming Programs and Construction Projects (0-8 years)
-
Sealing manhole covers in low lying area.
-
Determining how to fund stormwater projects (Stormwater Financing Study).
-
Prepare and facilitate an Enhanced Educational Program to educate the community on measures residents can do in their home.
-
Updating the City’s Development Standards Manual.
-
Implementing Pilot Projects, Sewer Monitoring and Evaluation of Solutions to test benefit of recommended source control measures.
-
Storm Sewer System Improvement in Riverside Area funded by Disaster Mitigation and