Action 4.6 Complete infrastructure projects that received funding as part of the Disaster Mitigation & Adaptation Fund grant
- Implement the Pontiac/St. Paul pump station study;
- Implement stormwater management improvements to Tranby Park;
- Complete the Upper/Lower Little River Flood Plain mapping study
Action 4.7 Continue to invest in stormwater and sewer infrastructure
- Conduct vulnerability and risk assessments for critical infrastructure including pump stations;
- Invest in municipal drain and stormwater pond improvements;
- Where warranted, enhance stormwater infrastructure operations and maintenance;
- Increase drawdown rates for storm water ponds;
- Enhance phragmites control to maintain capacity of drains and ponds.
Action 4.8 Protect and improve roads from flooding damage
- Assess frequently flooded roads and consider road improvements
Action 4.9 Promote green infrastructure options for drainage issues on public and private property
- Research and implement the use of green infrastructure as part of municipal projects;
- Encourage the use of French drains, dry wells, bioretention stormwater ponds or raingardens to enhance rear yard drainage as opposed to connecting to a storm sewer;
- Promote, encourage and protect the use of urban forests as Green Infrastructure for rainwater interception and erosion control benefits.
Action 4.10 Review design standards and maintenance practices as they relate to newest climate projections
- Review engineering design, construction and maintenance for surface pavements;
- Review engineering design, construction and maintenance for sewer and stormwater management infrastructure;
- Enhance preventative maintenance for HVAC units;
- Identify cooling options for electrical and mechanical components susceptible to high heat and equipment wear and tear.
Action 4.11 Explore options for increased electrical power generation from City of Windsor infrastructure (generators) to supplement Ontario’s electrical grid as warranted