In the event of any inconsistency or conflict in the contents of the following documents, such documents shall take precedence and govern in the following order:
-
Agreement
-
Addenda
-
Special Provisions
-
Contract Drawings
-
Supplementary Specifications Practices and Mandatory Procedures and
-
Standard Specifications
-
Form of Tender
-
Supplemental General Conditions
-
General Conditions
-
Working Drawings
Later dates shall govern within each of the above categories of documents.
-
-
In the event of any conflict among or inconsistency in the information shown on Drawings, the following rules shall apply:
-
Dimensions shown in figures on a Drawing shall govern where they differ from dimensions scaled from the same Drawing;
-
Drawings of larger scale shall govern over those of smaller scales;
-
Detailed Drawings shall govern over general Drawings; and
-
Drawings of a later date shall govern over those of an earlier date in the same series.
-
-
In the event of any conflict in the contents of Standard Specifications the following order of precedence shall govern:
-
Specifications approved or modified by the Engineer
-
City of Windsor Standard Specifications
-
GC 3 ADMINISTRATION OF CONTRACT
GC 3.01 ENGINEERS AUTHORITY
i. The Engineer will be the Corporation’s representative during the construction and until the issuance of the Completion Certificate or the