1. In the event of any inconsistency or conflict in the contents of the following documents, such documents shall take precedence and govern in the following order:

    1. Agreement

    2. Addenda

    3. Special Provisions

    4.  Contract Drawings

    5. Supplementary Specifications Practices and Mandatory Procedures and

    6. Standard Specifications

    7. Form of Tender

    8. Supplemental General Conditions

    9. General Conditions

    10. Working Drawings

    Later dates shall govern within each of the above categories of documents.

  2. In the event of any conflict among or inconsistency in the information shown on Drawings, the following rules shall apply:

    1. Dimensions shown in figures on a Drawing shall govern where they differ from dimensions scaled from the same Drawing;

    2. Drawings of larger scale shall govern over those of smaller scales;

    3. Detailed Drawings shall govern over general Drawings; and

    4. Drawings of a later date shall govern over those of an earlier date in the same series.

  3. In the event of any conflict in the contents of Standard Specifications the following order of precedence shall govern:

    1. Specifications approved or modified by the Engineer

    2. City of Windsor Standard Specifications

GC 3 ADMINISTRATION OF CONTRACT

GC 3.01   ENGINEERS AUTHORITY

i. The Engineer will be the Corporation’s representative during the construction and until the issuance of the Completion Certificate or the