Document/Issue

Mitigating Measure/Commitments/Recommendations from EA

Implemented

(Yes/No)

Action Summary Reference Nos.

Additions/Exceptions

Removal and exposure of topsoil and subsoils during construction of culvert extension at Tributary ‘D” and channel realignments.

Design and implement erosion and sediment controls to contain/isolate the construction zone, manage site drainage/runoff and ensure all areas draining to Broadway Drain are stabilized following construction.

Yes

AS2, AS8

Manage excess material by temporarily storing, handling and disposing of all materials generated (e.g., organics, soils, wood debris, concrete, etc.) during site preparation, construction and clean-up to prevent their entry into Broadway Drain.

Yes

AS2

Temporary stockpiles of material are to be stockpiled a minimum of 30 m from the watercourse and temporarily stabilized and/or contained.

Yes

AS2

Uncontrolled release of dewatering effluent from excavation of culvert extension or channel realignment.

Manage dewatering operations from excavation to prevent erosion and/or release of sediment laden contaminated water to Broadway Drain.

Yes

AS2

Design and use temporary settling basins, filter bags and energy discharge diffusers as required.

Yes

AS2

Mobile or stationary equipment may release or leak fuel, oil, grease or other contaminant to the watercourse.

Prohibit/limit access to watercourse/watercourse banks.

Yes

AS2

Access will be limited to the extent needed to properly construct the new channel

Management of spills (spill response plan).

Yes

AS2

Management of equipment - operate, maintain and store (e.g., refuel, lubricate) all equipment and materials in a manner that prevents entry of any deleterious substances to the watercourse.

Yes

AS2

Increase erosion potential

Prohibit/limit access to watercourse/watercourse banks.

Yes

AS2

Access will be limited to the extent needed to properly construct the new channel

Design and implement erosion and sediment controls to contain/isolate the construction zone, manage site drainage/runoff and ensure all areas draining to Broadway Drain are stabilized following construction.

Yes

AS2

Stabilize and revegetate all disturbed flood plain areas that drain to Broadway Drain, including stabilization of newly constructed channel realignment.

Yes

AS2, AS8

Directly/indirectly adversely affect fish/eggs.

Transfer any fish isolated in the work area of Broadway Drain using appropriate capture, handling and release techniques to prevent harm/stress to fish. Release in suitable habitat downstream of work area.

Yes

AS3

Implement timing restrictions, as identified by MNR, on in-water work to protect sensitive life stages of fish.

Yes

AS3

Potential Enhancement and Compensation Opportunities

In situations where the application of the mitigation measures cannot sufficiently address the residual effects of the crossing on fish and fish habitat, habitat compensation measures may be required to counterbalance or offset the residual effects.

Yes

AS3, AS4

The designs will be based on natural channel design principles and proven approaches as experienced by the design specialists.

Yes

AS4

The selected designs will require approval from the regulatory agencies before implementation.

Yes

AS4

Appropriate channel form and design elements will be based upon the results of detailed geomorphological assessments.

Yes

AS4