Drain will be incorporated in the construction contract through the Detail Design drawings and stipulations contained in Special Provisions and Operational Constraints of the Contract.

4.2.1 Changes or alterations to water quality and quantity
4.2.2 Alterations to baseflow
4.2.3 Barriers to fish passage