T ABLE O F C ONTENTS

Distribution List

Preamble

Glossary of Terms

  1. INTRODUCTION .............................................................................................. 1

    • 1.1 Project Overview ................................................................................ 1

    • 1.2 Fisheries Plan Scope and Purpose.......................................................... 2

    • 1.3 Fisheries Plan Goals and Objectives....................................................... 3

  2. Existing Conditions .......................................................................................... 3

    • 2.1 Healy Drain Existing Conditions ............................................................ 3

  3. Aquatic Species at Risk ..................................................................................... 4

    • 3.1 Detroit River........................................................................................ 4

    • 3.2 Healy Drain ........................................................................................ 4

  4. Healy Drain Infilling........................................................................................... 4

    • 4.1 Scope and Purpose............................................................................... 4

    • 4.2 Proposed Works Overview...................................................................... 5

    • 4.3 Construction Methodology...................................................................... 5

  5. Construction Impacts and Mitigation Measures ...................................................... 6

    • 5.1 Potential Impacts to Fish and Fish Habitat ............................................... 6

    • 5.2 Residual Impacts and Compensation ....................................................... 6

    • 5.3 Mitigation Requirements ........................................................................ 7

      • 5.3.1 Requirements for Construction in Waterbodies and Waterbody Banks ........................................................................................................ 7

      • 5.3.2 Requirements for Control of Water from Dewatering Operations ........................................................................................................ 7

      • 5.3.3 Requirements for Sediment and Erosion Control ........................................................................................................ 8

      • 5.3.4 Requirements for Spill Response and Reporting ........................................................................................................ 8

  6. Environmental Monitoring Requirements and Responsibilities.................................... 9

  7. Conclusion.......................................................................................................10

    References.......................................................................................................11