T ABLE O F C ONTENTS

Distribution List

Preamble

Glossary of Terms                                                                                         page

  1. INTRODUCTION .......................................................................................... 1

    • 1.1 Project Overview ............................................................................ 1

    • 1.2 Fisheries Plan Scope and Purpose ..................................................... 2

    • 1.3 Fisheries Plan Goals and Objectives .................................................. 3

  2. Existing Conditions....................................................................................... 4

    • 2.1 Broadway Drain Existing Conditions................................................... 4

    • 2.2 Drainage channel ........................................................................... 4

    • 2.3 Detroit River .................................................................................. 5

  3. Aquatic Species at Risk.................................................................................. 6

    • 3.1 Detroit River .................................................................................. 6

    • 3.2 Broadway Drain and Drainage Channel............................................... 7

  4. Broadway Drain Realignment and Drainage Channel Infilling............................... 7

    • 4.1 Scope and Purpose ......................................................................... 7

    • 4.2 Proposed Works Overview................................................................ 7

      • 4.2.1 Offsetting Measures and Restoration Plan................................ 8

      • 4.2.2 Existing Drain Abandonment ................................................. 8

    • 4.3 Construction Methodology ............................................................... 8

  5. Construction Impacts and Mitigation Measures.................................................. 10

    • 5.1 Potential Impacts to Fish and Fish Habitat........................................... 10

    • 5.2 Residual Impacts ............................................................................ 10

    • 5.3 Mitigation Requirements................................................................... 13

      • 5.3.1 Requirements for Construction in Waterbodies and Waterbody Banks .................................................................................................. 13

      • 5.3.2 Requirements for Control of Water from Dewatering Operations .................................................................................................. 14

      • 5.3.3 Requirements for Sediment and Erosion Control .................................................................................................. 14

      • 5.3.4 Requirements for Spill Response and Reporting .................................................................................................. 15

  6. Environmental Monitoring Requirements and Responsibilities.............................. 16

    • 6.1 Construction Monitoring ................................................................... 16

    • 6.2 Post-Construction Monitoring............................................................. 17

  7. Conclusion ................................................................................................... 19