dispose of existing pipe, brush, sod, and deleterious materials at the existing bridge location; provide standard precast concrete block end protection with geogrid reinforcement; 1.0 metre wide sloped quarried limestone erosion protection adjacent to precast headwalls on drain banks; granular bedding, backfill, and Granular ‘A’ approach and transition; excavation, compaction, silt and sediment controls, traffic control, cleanup and restoration, complete. (080-080-01100-0000)                                                                            Lump Sum $ 27,500.00