Recommended Infrastructure Projects Central Windsor Area – Sewer Separation Program
These improvements include the construction of 4 new storm sewer outlets and improvement to 2 existing outlets. This solution requires the direction of both municipal and private property drainage, such as drainage from roofs, front and rear yards and alleys, to the storm sewer system and out of the combined sewage system.
In addition, a Retention Treatment Basin (RTB) is proposed at the Lou Romano water reclamation plant, which will reduce the frequency of CSOs and better manage wet weather inflow at the treatment plant.