9. This bridge is a shared access which serves parcels 080-080-00300-0000 and 080-080-00400-0000. This bridge pipe is in poor condition and requires replacement with corrosion occurring along the riveted joints and deformation starting to occur. Additionally, the pipe is undersized and does not meet the capacity required. The report and plans will provide the City with the details needed for construction and for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
10. This bridge is a shared access which serves parcels 080-080-00405-0000 and 080-080-00500-0000. This bridge is in good condition and does not require any work at this time. The report and plans will provide the City with the details needed for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
11. This bridge access serves parcel 080-080-00600-0000. This bridge is in good condition; however, it is undersized and does not meet the capacity required and therefore requires replacement. The report and plans will provide the City with the details needed for construction and for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
12. This bridge access serves parcel 080-080-00601-0000. This bridge pipe is in poor condition and requires replacement as rusting and significant deformation is starting to occur. The report and plans will provide the City with the details needed for construction and for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
13. This bridge access serves parcel 080-080-00700-0000. This bridge is in good condition and does not require any work at this time. The report and plans will provide the City with the details needed for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
14. This bridge access serves parcel 080-080-00701-0000. This bridge is in fair condition and does not require any work at this time. The report and plans will provide the City with the details needed for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
15. This bridge access serves parcel 080-080-00800-0000. This bridge is in good condition and does not require any work at this time. The report and plans will provide the City with the details needed for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
16. This bridge access serves parcel 080-080-00900-000. Although the bridge is in fair condition, it is set too high, appears to be deforming and is too short and narrow to be safe. Lowering the pipe to the required grade would further affect the top width. The report and plans will provide the City with the details needed for construction and for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
17. This bridge serves Sutherland Avenue owned by the City of Windsor. This bridge is in good condition and does not require any work at this time. Since the bridge is serving the public road crossing and therefore would not be needed if the road was taken out of service, we recommend that 100% of all future maintenance costs for works to the bridge be borne by the owners of the roadway pursuant to Section 26 of the Drainage Act. The report and plans will provide the City with the details needed for future work on the bridge pursuant to the maintenance provisions of the Drainage Act, including reduction of the hump over the centre of the bridge span.
18. This bridge access serves parcel 080-080-00800-0000. This bridge is in good condition and does not require any work at this time. The report and plans will provide the City with the details needed for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.
19. This bridge access serves parcel 080-080-01100-0000. This bridge pipe is in poor condition and requires replacement as the pipe shows significant rusting and deformation. The report and plans will provide the City with the details needed for construction and for future work on the bridge pursuant to the maintenance provisions of the Drainage Act.