separate applications, rather than as discrete “phases” within a single application.
The OEB has assigned a separate docket number (EB-2020-0181) for “Phase 2” of the 2021 Rate Application.
-
7. Enbridge Gas is therefore filing this separate Application for its 2021 ICM requests. With this Application, Enbridge Gas is seeking Board approval for ICM funding for three projects in 2021 – the St Laurent NPS 12 Replacement in the EGD rate zone, and the London Line Replacement Project and the Sarnia Industrial Reinforcement Project in Union rate zones. Collectively, these projects are referred to as the “2021 ICM Projects”. The ICM evidence including the appendices are filed as Exhibit B, Tab 2, Schedule 1.2
-
8. Also, in accordance with the Board’s directive in the MAADs Decision3, Enbridge Gas is filing a consolidated Utility System Plan (including an Asset Management Plan and a Customer Engagement Study) for the ICM requests with this Application. The Utility System Plan is filed as Exhibit C, Tab 1, Schedule 1. The Asset Management Plan and the Customer Engagement study are filed as Exhibit C, Tab 2, Schedule 1 and Exhibit C, Tab 3, Schedule 1 respectively.
APPROVAL REQUESTS
9. The specific approvals sought in this Application are as follows:
-
The requests for ICM funding for the 2021 ICM Projects, including the ICM unit rates beginning in 2021 for the duration of the deferred rebasing period to recover the total revenue requirement of the 2021 ICM Projects from 2021 to 2023;
2 In order to maintain consistency with prior applications related to ICM requests during the five year term, Enbridge Gas has labeled the ICM request evidence as Exhibit B-2-1 (meaning that there are no B-1-1 exhibits in this filing).
3 EB-2017-0306/EB-2017-0307, Decision and Order, August 30, 2018, pp.32-34.