By comparison, a connection to services along County Rd. 42 would be a much shorter (1O metres) less- complicated direct run across ourgrassed front lawn. lam estimating a difference in distance to be G3 metres (207 ft), never mind the routing complications highlighted above.
I plon to hove o reputable sewer controctor quote the cost to connect to Boseline os you ore proposing. t will then be oble to put an actual hord cost to connecting to Boseline Rd., and to the difference between Boseline and o future County Rd. 42 connection. I om ocknowtedging thot this future connection would be in todoy's dollars and will very likely cost more in the future.
In closing, I wish the City all of the best in constructing this project, and hope that my opposition to my property being included is given serious consideration.