ENWIN Comments

Hydro Engineering: No Objection to Re-zoning

Water Engineering: Water Engineering has no objections to the rezoning.

Public Works-Engineering Comments

Since this proposed development will require Sit Plan Control, Public Work’s stormwater management requirement will be deferred for that process.

ROB PERISSINOTTI, P.Eng. | Technologist III | Engineering Department – Right-of-Way Division

Engineering Department

350 City Hall Square West | 2nd Floor Suit 210 | Windsor, ON | N9A 6S1 (519)-255-6257 ext. 6615