Page: 332
CITY OF WINDSOR GENERAL CONDITIONS
TABLE OF CONTENTS
- GC 1 INTERPRETATION 3
- GC 1.01 CAPTIONS 3
- GC 1.02 GENDER AND SINGULAR REFERENCES
- 3 GC 1.03 DEFINITIONS 3
- GC 2 CONTRACT DOCUMENTS 6
- GC 2.01 GENERAL 6
- GC 2.02 ACCURACY OF DRAWINGS AS TO LOCATIONS OF STRUCTURES AND UTILITIES 7
- GC 2.03 SOUNDINGS, BORINGS & INSPECTION OF SITE 7
- GC 2.04 DOCUMENTS MUTUALLY EXPLANATORY 8
- GC 2.05 CUSTODY OF DRAWINGS 8
- GC 2.06 ORDER OF PRECEDENCE 8
- GC 3 ADMINISTRATION OF CONTRACT 9
- GC 3.01 ENGINEERS AUTHORITY 9
- GC 3.02 DUTIES AND POWERS OF ENGINEER’S REPRESENTATIVES 11
- GC 3.03 WORKING DRAWINGS 12
- GC 3.04 RIGHT OF THE ENGINEER TO MODIFY METHODS AND EQUIPMENT 13
- GC 3.05 ASSIGNMENT AND SUB-LETTING 13
- GC 3.06 WORKING AREA 14
- GC 3.07 REMOVAL OF WORKERS 14
- GC 3.08 SERVICE OF NOTICE ON CONTRACTOR 15
- GC 3.09 LAYOUT 15 GC 3.10 ACCESS TO SITE 15
- GC 3.11 EXAMINATION OF WORK BEFORE COVERING UP 16
- GC 3.12 QUALITY OF MATERIALS, WORKMANSHIP AND TESTS 16
- GC 3.13 PAYMENT FOR TESTING 17
- GC 3.14 URGENT REPAIRS 17
- GC 3.15 SUSPENSION OF WORK 18
- GC 3.16 EXTENSION OF TIME FOR COMPLETION 18
- GC 3.17 DELAYS 18
- GC 3.18 VARIATIONS 19
- GC 3.19 EXTRA WORK 20
- GC 3.20 ADDITIONAL WORK 20
- GC 3.21 CLAIMS, NEGOTIATIONS, MEDIATION, ARBITRATION 20
- GC 3.22 NOTICES 24
- GC 3.23 NOTICE OF COMPLETION OF WORKS 25
- GC 3.24 END OF MAINTENANCE PERIOD 25
- GC 3.25 ASSUMPTION OF WORKS 26
- GC 3.26 SITE MEETINGS 26
- GC 3.27 DEFAULT BY CONTRACTOR 26
- GC 4 CONTRACTOR’S RESPONSIBILITIES AND CONTROL OF THE WORK 28
- GC 4.01 GENERAL 28
- GC 4.02 LAYOUT 31
- GC 4.03 TRAFFIC CONTROL REQUIREMENTS 32
- GC 4.04 MAINTAINING ROADWAYS AND DETOURS 33
- GC 4.05 ACCESS TO PROPERTIES ADJOINING THE WORK AND INTERRUPTION OF UTILITY SERVICES 33