Page: 158
TABLE OF CONTENTS
- Introduction 1
- Study Area and Watercourse Crossings Locations 2
- Purpose of Report 2 2.0
- Collection of Background Information 3
- Field Investigations (2010) 5
- Results of Field Investigations 6
- Broadway Drain 6 Healy Drain 7
- Aquatic Effects Assessment 9
- Proposed Works and Potential Impacts 9
- Project-Specific Impacts 11
- Mitigation Measures 11
- Changes or alterations to water quality and quantity 12
- Alterations to baseflow 12
- Loss of fish habitat 13
- Erosion and Sediment Control 13
- Fish Protection 13
- Channel Realignment 14
- Construction Access, Site Controls and Operational Constraints 15
- Enhancement Measures Following Construction 16
- Site Inspection and Monitoring 16
- Residual Effects 17
- 5.0 Categorization of Project Risk and HADD Determination 21
- 6.0 Potential Enhancement and Compensation Opportunities 24
- 7.0 Monitoring and Commitments for the Undertaking 26
- 8.0 Summary 27
- 9.0 References 28
LIST OF FIGURES & TABLES
- Figure 1. Plaza B1 Location (Based on Draft Conceptual Design, April 2010) 2
- Figure 2. Summary of Fish Habitat Identified by LGL 5
- Figure 3. Risk Assessment Matrix 24
- Figure 4. Proposed Enhancement measure to Broadway Drain 26
- Table 1. Summary 2006 Sampling Locations on Broadway and Healy Drains 4
- Table 2. Summary of Existing Fish and Fish Habitat Conditions 8
- Table 3. Aquatic Effects Assessment Summary 17
- Table 4. Risk Assessment (Scale of Negative Effect and Sensitivity of Fish and Fish Habitat) 22
LIST OF APPENDICES
- APPENDIX A. Photographic Records
- APPENDIX B. Field Collection Records
- APPENDIX A. Photographic Records
- APPENDIX B. Field Collection Records