NET HST (1.76%) ON CONSTRUCTION……….. $ 60,699.73
TOTAL CONSTRUCTION COST ………$ 3,509,547.77
ENGINEERING AND INCIDENTALS
- Surveys, Report, Estimate, Drawings and Specifications, Construction Related Services, Meetings and Correspondence, attend Council Meeting, attend Court of Revision $ 288,312.38
- Duplication Cost of Report and Drawings $ 2,500.00
- Net H.S.T. on Incidental Items $ 5,480.02
- Estimated Cost of Finance and Eligible Municipal Administration $ 20,000.00
- Contingency Allowance for Engineering and Incidentals $ 10,000.00
TOTAL ENGINEERING AND INCIDENTALS…………………………….. $ 326,292.40
TOTAL ESTIMATE $ 3,835,840.17
9.0 Assessment Schedules
9.1 Construction Schedule of Assessment
From 2007 through 2015, costs associated with undertakings completed under the Drainage Act within the City of Windsor have been undertaken in accordance with CR388/2007, which states:
From 2007 through 2015, costs associated with undertakings completed under the Drainage Act within the City of Windsor have been undertaken in accordance with CR388/2007, which states:
That the City of Windsor undertakes drain maintenance and costing in the following method:
City of Windsor CONTINUE to use the general tax levy or the sewer surcharge levy, depending on location for drain maintenance costs in accordance with the City of Windsor Act, 1968: a) with the exception of private access structures, which are to be assessed to the benefiting property owners as per completed engineer's report and assessment schedule as a "special benefit" in accordance with s. 24 of the Drainage Act; b) Municipal Drains, excluding access structures will BE MAINTAINED at the general tax rate or sewer surcharge, depending on location, provided the landowners allow soil from the drains to be spread on their lands, as provided for in the Engineer's Report.