| existing facilities. Bell Canada requests an easement over the entire alley, or a 3m wide strip measuring 1.5m on either side of the aerial installation (for the length of the alley), as reasonably permitted. Since the easement is required in order to protect the integrity of the existing facilities and preserve service, Bell Canada kindly requests that the City of Windsor grant the easement prior to the sale of these lands into private ownership.Enclosed is a copy of the easement schedule to reference for this transaction | |
---|---|---|
Cogeco Cable Systems Inc. | Requires Easement protection | |
Canada Post | No concerns | |
Rogers Communications | ||
Telus Communications | TELUS has no infrastructure in the area of your proposedwork. Permit expires six(6) months from approval date. | |
MNSi | MNSi would like an Aerial Easement through the proposed closure area to accommodate our existing plant. | |
EnWin Utilities – Hydro | No Objection, however, an easement named to Enwin Utilities Ltd. is required upon closing along the entire North limit of the site to accommodate existing overhead 16kV and 120/240 volt hydro distribution, poles and down guy wires | |
Windsor Utilities – Water | Water Engineering has no objections. | |
Endridge Gas | ||
Legal Department | For land abutting properties zoned RD1.2, $1.00 plus deed preparation fee and proportionate share of the survey cost as invoiced to The Corporation of the City of Windsor by an Ontario Land Surveyor | |
OTHER: | ||