installation (for the length of the alley), as reasonably
permitted.
Cogeco Cable Systems Inc. Cogeco will require this easement.
Canada Post Canada Post has no comments for the attached application.
Rogers Communications
Telus Communications TELUS has no infrastructure
in the area of your proposed
work. Permit expires six(6) months from approval date.
MNSi MNSi would like an aerial easement through
the entire length
of the alley closing
in question
EnWin Utilities – Hydro Hydro Engineering:
No objection, however, an easement
named to ENWIN Utilities Ltd. is required for the entire
north/south alley upon closing
to accommodate existing
overhead 16kVand 120/240 volt hydro distribution, poles and
down guy wires.
Windsor Utilities – Water Has No Objections
Union Gas/Eldridge Gas I can confirm
that Union Gas Limited, now known as
Enbridge Gas Inc. does not have any facility
located within
the proposed closure.
Legal Department It appears that the owner of 1722 Albert is using
the alley
to
access the garage at the rear of the property. The reason for
the closure stated on this form includes
to prevent “ruts due to
car traffic”. This would support the conclusion
that the alley is
being used. Should the alley or a portion of it be closed: For
land abutting properties zoned RD1.3, $1.00
plus deed preparation fee and proportionate share of the
survey cost as invoiced
to The Corporation of the City of
Windsor by an Ontario Land Surveyor.
OTHER: