ADDITIONAL INFORMATION MEMO
(d) the engineer has reported that the drainage works is not required, or is impractical, or cannot be constructed, may appeal to the Tribunal, and in every case a notice of appeal shall be served within 40 days after the sending of the notices under section 40 or subsection 46 (2), as the case may be. R.S.O. 1990, c. D.17, s. 48 (1); 2006, c. 19, Sched. A, s. 6 (1); 2010, c. 16,
58 (1) Where the council of an initiating municipality has adopted a report for the construction of a drainage works after the time for appealing has expired and there are no appeals or after all appeals have been decided, the council may pass the provisional by-law to which the engineer’s report was attached, thereby authorizing the construction of the drainage works, and work may be commenced ten days after the by-law is passed if no notice of intention to make application to quash the by-law has been filed with the clerk of the council. R.S.O. 1990, c. D.17, s. 58 (1); 2010, c. 16, Sched. 1, s. 2 (23).
I am requesting that the existing recommendation:
“That City Council ADOPT the drainage report completed by Landmark Engineers Inc., dated January 16, 2020 (attached), for the Repair and Improvement of the Broadway and Healy Drains by giving first and second readings to Provisional By- law ____-2020 in accordance with Section 45 of the Ontario Drainage Act.”
Be replaced with the following to be included in the May 4th, 2020 Agenda:
“That City Council ADOPT the Drainage Report completed by Landmark Engineers Inc., dated January 16, 2020 (attached), for the Repair and Improvement of the Broadway and Healy Drains and PASS By-law ____-2020 in accordance with the Drainage Act.”
- Joseph Dattilo, P.Eng. Project Administrator Engineering – Corporate Projects 400 City Hall Square East, Suite 404B Windsor, Ontario N9A 7K6 www.citywindsor.ca Phone: (519) 255-6100 ext. 6825