COUNCIL MEMBER | | QUESTION – ISSUES RAISED | |
Mayor Dilkens | City Engineer, City Planner & Chief Building Official | CQ1-2020 Asks Administration to prepare a report on policy and/or bylaw changes that require new construction projects in the City of Windsor to prepare for electric vehicle infrastructure including, at a minimum, the rough-in necessary to facilitate future transition to electric vehicles. In addition, report back on best practices or policies that would benefit existing buildings to convert as needed. | Type of Response Required-Written Report |
| | SW/13715 18.1 (January 20, 2020) | |
Francis | City Engineer | CQ 3-2020 Asks that Administration provide Council with a report regarding extending the payment option period for homeowners in situations of high costs pertaining to improvement projects, such as drainage reports/repairs and or local improvement projects. | Type of Response Required-Written Report |
| | SW2020 (February 3, 2020) | |
McKenzie | Community Development & Health Commissioner and to City Planner/Executive Director of Planning & Building | CQ 4-2020 That Administration prepare a comparative analysis of the Affordable Housing frameworks and incentives that are in place in comparable municipalities. To the extent that the data is available the analysis should consider all forms of affordable housing and the composition of the affordable housing marketplace in the communities analyzed. | Type of Response Required-Written Report |
| | SS2020 (February 3, 2020) | |
Costante | City Engineer | CQ 5-2020 Asks that administration investigate and report back on the possibility of increasing the number of on-street Paid for Parking spots in the Wyandotte West business area, particularly in the first areas north and south of Wyandotte in place of residential permitted locations. The report shall include an analysis on projected revenues and the effects of lost residential spots. | Type of Response Required-Written Report |
| | ST2020 (March 2, 2020) | |