Null

SCHEDULE 3 FEES – 2020

MINIMUM PERMIT FEE A minimum permit fee of $212.00 will be assessed for the processing and issuance of permits, except where otherwise noted in this By-law.

SERVICE FEE A $40.00 Digital Service Fee is applicable on all permit types. All Services Fees are non-refundable.

GENERAL APPLICATION FEES
1 Zoning Certificate Fee - Small Residential Permits (alterations, decks, pools, etc.) $50.00 per applicable permit
2 Zoning Certificate Fee – New Home Construction $100.00 per applicable permit
3 Zoning Certificate Fee– All other Permits not listed in 1 and 2 above $200.00 per applicable permit
4 Permit Holdback Fee $1000.00 per applicable permit
5 Permit Deposit $500.00 per dwelling unit
BASE PERMIT FEES
Residential $ / Sq-Ft ($ / Sq-M)* unless otherwise indicated

1

House (OBC**: Part 9, Group C)(New, Alteration, and Second / Third Dwelling Unit)
(Fee calculation to include the sum of all roofed areas(2) - i.e. attached garages, carports, covered porches, supported roofs over attached decks or landings, etc.)
$1.50 ($16.15)*(2)- Plus $450.00 Mechanical Fee- Plus applicable extras: attached Deck/Porch without a Roof, Basement Floor Area Fee(3), Plumbing Fees, Finished Basement Floor Area Fee(4) and any other applicable fees indicated in this By-law/Schedule

2

All Other Group C occupancies as set out in the OBC** (New, Alteration)
(Fee calculation to include the sum of all floor areas(2), including floors below grade)

$2.00 ($21.53)*(2)- Plus $450.00 Mechanical Fee per dwelling unit- Plus Plumbing Fees and any other applicable fees as indicated in this By-law/Schedule
Industrial / Commercial / Institutional (ICI) $ / Sq-Ft ($ / Sq-M)* unless otherwise indicated

3
Industrial / Commercial / Institutional (OBC**: Group A, B, D, E and, F) (New, Alteration)
(Fee calculation to include the sum of all floor areas(2), including floors below grade)

$2.45 ($26.37)*(2)(7)(8)- Plus Plumbing Fees and any other applicable fees indicated in this By-law/Schedule
Post Disaster Buildings $ / Sq-Ft ($ / Sq-M)* unless otherwise indicated

4
Post Disaster Buildings(as defined in Division A, Article 1.4.1.2 of the OBC**) (New, Alteration)
(Fee calculation to include the sum of all floor areas(2), including floors below grade)

$3.50 ($37.67)*(2)- Plus Plumbing Fees and any other applicable fees indicated in this By-law/Schedule