2020

Total Outstanding: 1

COUNCIL MEMBER   QUESTION – ISSUES RAISED  
Mayor Dilkens City Engineer, City Planner & Chief Building Official CQ1-2020 Asks Administration to prepare a report on policy and/or bylaw changes that require new construction projects in the City of Windsor to prepare for electric vehicle infrastructure including, at a minimum, the rough-in necessary to facilitate future transition to electric vehicles. In addition, report back on best practices or policies that would benefit existing buildings to convert as needed.
SW/13715 18.1 (January 20, 2020)
Type of Response Required-Written Report

/sg as of January 30, 2019