City-wide Engineered Services Draft Capital Programs
• Capital programs have been developed in consultation with City staff
• DC eligible costs are adjusted in accordance with legislation:
- – Grants, subsidies & contributions
- – Benefit to existing or replacement elements
- • Largely from previous DC study
- – Sandwich South shares
- – Available DC reserve funds
- – "Post-period" benefit shares
- • Largely from previous DC study: 66% of projects occurring in 1-5 yrs; 85% of projects occurring 5-10 yrs; 100% of projects occurring 10+ yrs
- • Recognizes long planning and benefitting period